withdrawn
OH-DC-0048
Quantum HPC Project Triton (Norton, withdrawn)
Campus: Former PPG limestone mine
Owner
Quantum HPC Infrastructure LLC
Operator
Quantum HPC
Primary use
hpc
Power
180 MW
(est)
estimated generation capacity (six gas turbines, off-grid)
Size
485,000 sq ft
Land area
90.00 acres
In service
Unknown
Location
Norton, Summit
Timeline
- proposal presented 2025-10 (unknown)
- town hall 2025-10-13 (unknown)
- proposal withdrawn 2025-10-17 (unknown)
- Norton 6-month DC moratorium 2025-12 (unknown)
Sources
Other
- https://www.wkyc.com/article/news/local/summit-county/norton-data-center-project-will-not-move-forward-city-council-ppg-mine-site-limestone-drive/95-13c2926a-e2b2-4e81-b9fb-0cdae35bb7ca
- https://cityofnorton.org/DocumentCenter/View/4033/Data-Center-Press-Release
- https://spectrumnews1.com/oh/columbus/news/2025/10/14/norton-holds-public-meeting-for-proposed-data-center-
Data confidence
Location
High
Owner Operator
High
Phase
High
Mw
Medium
Sqft
High
In Service
Low
Buildings
Low
Land Area
High
Primary Use
High
What we are still verifying
Withdrawn. Turbine MW-per-unit not disclosed. Quantum HPC has zero operational facilities. Norton moratorium through mid-2026.
Spot an error? Email a correction with the record ID OH-DC-0048.